Acrylic polymer cementious coating is applied for fresh concrete. If the concret slab is old, then we need to remove all protective plastering and screading for applying such coating. This coating must be protected by protective plastering or screading. If protected, this will last for a long time. Cementious waterproofing have an elongation of about 180%. Bridge cracks updto 1mm

This method can be applied to new terrace/roof before plastering, bathrooms, balconies, etc.

Explore More

Bathroom waterproofing for under construction building

Strutural waterproofing for new bathrooms It is very important to waterproof bathrooms during its construction time. It is very difficult to arrest water seepage from an existing bathroom which is

Basement Waterproofing

The Basement and the Foundation are the places that require the most attention because water can cause major problems. Water can crawl into wall spaces and create a wet damp

Polyurethane Injection Grouting

PU grouting is a specialised technique that involves the injection of expanding polyurethane to stop any water flowing down or through cracks or to fill voids under slabs, concrete joints or behind concrete walls and